Good condition, built and painted to a fairly good standard. Tested and runs well in both directions.
Perseverance Em Gauge Kit built Lms/ Br 57ft Non Corridor Brake Third Coach Kit
TRIANG R620 KIT BUILT LMS ENGINEERING SIGNAL MESS SLEEPING CLERESTORY COACH oi
WESTDALE? O GAUGE KIT BUILT LMS 57' STANIER 3rd CLASS CORRIDOR COACH 1451
O Gauge Kit Built LMS Brake 3rd Coach 1925
TRIANG R620 KIT BUILT LMS ENGINEERING DEPT CREWE CLERESTORY BRAKE COACH 24028 oi
O Gauge Kit Built LMS Suburban Coaches x 3