24, ¼, ½, ¾, 25, ¼, ½, ¾, 26, ¼, ½, ¾. Add a bit of detail to your lineside. These are primarily as reference points that can be uséd to specify a position on the infrastructure, for example when reporting an incident or in connection with engineering work.