Product Image

Miniature Bulb // Red 3V 50mA, Approx. 10mm Long Lead Wires - 10 Pcs.

£3.43

Miniature light bulbs // red 3V 50mA, - approx. 10 mm long connecting wires - 10 pieces. Color red, 3 V/50 mA, Dimensions (LxØ): 6.5x3 mm, approx. 10 mm long connecting wires. More top products to my other articles INVENSYS MS65 electrical timer switch, 220 V, 16 A/230 V~, 15 min. Buy it now Geared motor, 24V, 9.3 rpm Buy it now Control thermostat DREEFS RTXII/03, 5...35 °C Buy it now Precision mechanic screwdriver and hook set, 12 pieces, 170 mm Buy it now Sub-D adapter, 15-pin 2-row Buy it now Sub-D adapter, 15-pin -2-row Sub-D adapter, VGA 15-pin -3-row Etching set / model making Soldering gun with tin feed / 3 adjustable temperature ranges Precision mechanic Torx screwdriver set 7 pieces with plastic storage box Powered by Supreme supremeauctiononlinesoftware.staticWidgets.templ.

Product Reviews

Name: Review: