Site Logo
My Account | Wishlist | Basket
All Categories
Model Railways
Power & Control

Speed Controllers

  1. Home
  2. Model Railways
  3. Power & Control
  4. Speed Controllers
Product Image

ORIGINAL H AND M H&M DUETTE TWIN SUPPLY POWER UNIT G/C TESTED LONG LEAD

£19.99

LONG POWER LEAD. TESTED WORKING.

Product Reviews

Name: Review:

Related Products

HAMMANT & MORGAN H AND M CUI/LC SPEED CONTROLLER, VARI-WAVE AND OVERLOAD CIRCUIT

HAMMANT & MORGAN H AND M CUI/LC SPEED CONTROLLER, VARI-WAVE AND OVERLOAD CIRCUIT

£8.66

H AND M Minipack Hammant & Morgan, double insulated 12V DC POWER 4 TESTED  T8

H AND M Minipack Hammant & Morgan, double insulated 12V DC POWER 4 TESTED T8

£31.89

H and M Duette Controller - Spares Or Repairs

H and M Duette Controller - Spares Or Repairs

£34.99

H and M Duette Twin Track Model Railway Controller, Tested Working

H and M Duette Twin Track Model Railway Controller, Tested Working

£23.58

Model Train H And M Power Control Manual With 1965 Price List

Model Train H And M Power Control Manual With 1965 Price List

£12.94

Vintage Hammer & Morgan H and M Minor Transformer Unit untested Vintage England

Vintage Hammer & Morgan H and M Minor Transformer Unit untested Vintage England

£8.93

Privacy Policy

All third-party product, company names and logos are trademarks™ or registered® trademarks and remain the property of their respective holders. Use of them does not imply any affiliation with or endorsement by them. All references to third party trademarks are intended to constitute nominative fair use under applicable trademark laws.

Content is provided ‘as is’ and is subject to change or removal at any time.

© buyTrains.co.uk 2026