PHOTO DDUALLT SPIRAL UNDER CONSTRUCTION THE CONSTRUCTION OF THE LOWER RESERVOIR
£1.75
THE NEW LINE NEEDED TO GAIN HEIGHT QUICKLY FROM ITS CONNECTION WITH THE EXISTING LINE AT DDUALLT SO A SPIRAL (THE ONLY ONE OF ITS KIND IN THE UK) WAS CONSTRUCTED. PHOTO PAPER THICKNESS NORMAL PHOTOGRAPH THICKNESS.