THE CURRENT RAILWAY STATION BUILDINGS LARGELY DATE FROM THE RECONSTRUCTION OF 1879 WHICH SAW THE ORIGINAL LEVEL CROSSING REPLACED BY A BRIDGE. IT WAS TRANSFERRED FROM THE LONDON & NORTH EASTERN RAILWAY TO LONDON UNDERGROUND AS PART OF THE EASTERN EXTENSIONS OF THE CENTRAL LINE AND WAS FIRST SERVED BY THE CENTRAL LINE ON 5TH MAY 1947.