PHOTO LOADING BEET AT WELLINGTON BRIDGE THE SUGAR BEET LOADING PROCESS AT WELLINGTON BRIDGE WAS HIGHLY AUTOMATED WITH RAIL WAGONS PULLED THROUGH THE LOADING AREA BY A SMALL 4-WHEEL ELECTRIC MULE. FOLLOWING A CHANGE IN EU SUBSIDIES IRISH BEET PRODUCTION CEASED IN 2006.