EVENTUALLY TWENTY-TWO WERE GER BUILT AT STRATFORD ALL SUPERHEATED AND ALL WITH RIGHT HAND DRIVE. THE LNER BUILT MANY MORE THE CLASS EVENTUALLY TOTALLING 134 IN NUMBER. 69621 ORIGINALLY 999 WAS THE LAST ENGINE BUILT AT STRATFORD ORDERED BY THE GER IN 1921 AND FINALLY COMPLETED IN 1924.