THERE WERE SCHEDULED THROUGH TRAINS UP UNTIL 1937 WHEN THE LINE FROM WATERLOO AS FAR AS ALTON WAS ELECTRIFIED. ALTON AND CONNECTION WITH THE NATIONAL RAIL NETWORK WAS REACHED ON 25TH MAY 1985. ALRESFORD IS NOW THE ADMINISTRATIVE HEADQUARTERS OF THE LINE.